Edinburgh Climate Change Institute

The city’s former Royal High School now supports research, policy exchange and collaboration on climate change.

Quick facts

Date
Built 1777; later nineteenth- and twentieth-century work; converted 2011–2013
Architect / designer
Alexander Laing; later work by Sir Rowand Anderson; conversion by Malcolm Fraser Architects
Type
Classical former school adapted for climate research and knowledge exchange
Designation
Listed building, Category B (LB27999)
OS grid reference
NT 26151 73477

Architecture and continuing use

Alexander Laing’s 1777 school presents a symmetrical, two-storey, eleven-bay classical front to Infirmary Street. Smooth ashlar blocks, a low base course, horizontal string course and moulded eaves cornice set out the proportions. The outer pairs of bays project slightly, while four Doric columns form a shallow, single-storey central portico. Its pediment marks the entrance without overwhelming the exceptionally long frontage.

Most windows on this principal face retain the proportions of twelve-pane sash-and-case openings. Behind, the roofs are slated and hipped. A five-stage square tower, now capped by a curved ogee roof, rises over the more altered eastern side; its top two stages have squared-and-snecked stonework with contrasting dressed margins. These differences are useful clues to additions and rebuilding behind the apparently unified eighteenth-century street front.

A sequence of institutional adaptations

The building opened as the Royal High School in 1777, but Edinburgh’s expanding pupil population prompted a new school on Calton Hill, completed in 1829. The former school was then acquired by the nearby Royal Infirmary and converted in 1832 to a surgical hospital, with an operating theatre added on the east side. Separating surgical from medical patients was a practical reason for that change of use.

Following the opening of the new Royal Infirmary at Lauriston Place in 1879, the building served as the City Hospital for Infectious Diseases until 1903. The University of Edinburgh bought it in 1904. Sir Rowand Anderson adapted the premises for engineering and science departments and reconstructed the tower’s upper stages. Later university uses included archaeology. Malcolm Fraser Architects’ 2011–13 redevelopment adapted the old complex for climate-related research and meetings. The relatively intact entrance elevation therefore conceals a much longer sequence of specialised interiors.

What to notice

  • The eleven-bay front, with its subtly projecting end bays and disciplined ranks of sash windows.
  • The four-column Doric portico and pediment, whose classical language signals the former school’s public role.
  • The ogee-roofed tower at the rear, especially the masonry differences associated with later rebuilding.
  • The distinction between Laing’s street elevation and the enlarged eastern ranges that served hospitals and university departments.

Reading the surroundings

This is a working university institute rather than a general visitor attraction. Attend public events or arrange access and respect offices and teaching activity.

Timeline

  1. 1777 Alexander Laing’s Royal High School opened on this site.
  2. 1829–32 The school relocated to Calton Hill; the old building became a surgical hospital.
  3. 1879–1903 Used as the City Hospital for Infectious Diseases.
  4. 1904–05 Acquired by the University; Sir Rowand Anderson remodelled it for scientific teaching.
  5. 2011–13 Adapted by Malcolm Fraser Architects for the Edinburgh Centre for Carbon Innovation, now the Edinburgh Climate Change Institute.

What we know — and what remains uncertain

The institute was formerly styled the Edinburgh Centre for Carbon Innovation; current University sources use Edinburgh Climate Change Institute.

Sources & further reading

Location

reviewed Scotland’s Architecture record small badge = designation

OS grid reference NT 26151 73477 · Location confidence: High: the HES designation provides an official mapped National Grid Reference and the current source confirms the Place relationship or present identity. · Select the marker to open its satellite view in Google Maps. On desktop, drag Pegman (the yellow figure) onto a blue road. On mobile, turn on the Street View layer and tap a blue road. Other photo markers may be user-contributed.

Suggest a marker correction

Suggest a more accurate position

The teal marker is the current published position. The orange marker starts slightly to its right so both remain visible; this is only a visual starting position. Tap the correct place on the map or drag the orange marker. Sending this form creates a private review entry only; it does not move the published marker.

Current published point Your suggested point

Map: © OpenStreetMap contributors. You can also enter checked coordinates below.

The orange marker is temporarily offset so the teal marker remains visible. Drag it or tap the correct position.

Privacy: this feature stores the suggested coordinates, optional note and optional supporting link in a private administrator log. It does not ask for or store your name, email address, IP address or browser identifier. Routine hosting security logs may still record ordinary request information. Please do not include sensitive personal information.

Place: Edinburgh · Current use: University of Edinburgh climate institute, offices, meetings and events (checked 2026-08-23)

Last reviewed: 2026-10-23 · Record: SHD-REC-EDI-CLIMATE-INNOVATION

Getting here by public transport

Planning a visit? Plan your journey with Traveline Scotland for bus, rail and other public transport connections. Enter the town or nearest suitable stop as your destination; some buildings and rural sites may require a further walk or other onward travel.

Continue exploring

Take another unexpected route through Scotland’s buildings and places.