Three slender towers and overlapping cable fans carry the modern motorway crossing of the Forth, completing a remarkable sequence of railway, suspension and cable-stayed bridges.
Quick facts
- Date
- Built 2011–2017; opened to traffic 30 August 2017
- Designer / delivery
- Jacobs–Arup design consultancy; Forth Crossing Bridge Constructors consortium
- Type
- Three-tower cable-stayed motorway bridge
- Designation
- No Scottish statutory listing claimed
- Location
- Firth of Forth between South and North Queensferry; mapped centre approximate
Architecture and continuing use
The crossing stretches 2.7 kilometres over the Forth. Three tall concrete towers carry a slender deck on diagonal cable stays that overlap between the spans. As well as forming a striking repeated pattern, the overlapping cable arrangement stiffens the unusually long three-tower structure. The motorway bridge contrasts with the massive steel cantilevers of the 1890 Forth Bridge and the suspended deck of the 1964 Forth Road Bridge. The Queensferry Crossing now carries general motorway traffic; it has no ordinary pedestrian or cycle access.
Its story
Concern about the condition and capacity of the older road bridge led to a decision in 2007 to build a new crossing to its west. Jacobs–Arup were appointed design consultants in 2008, and main construction took place between 2011 and 2017. Traffic first crossed on 30 August 2017. Queen Elizabeth II formally opened the bridge on 4 September. The earlier road bridge was retained for public transport and walking and cycling, subject to operational restrictions.
What to notice
- Cable stays crossing one another between the three towers.
- The comparatively slender deck and single-column towers.
- Views that bring the three distinct bridge types into one composition.
Reading the surroundings
Use established public viewpoints and permitted paths. Do not stop on the motorway or enter bridge maintenance or operational areas. Check current traffic and weather restrictions with the operator.
Timeline
- 2007 Decision to pursue a new road crossing.
- 2008 Jacobs–Arup design consultants appointed.
- 2011–2017 Bridge constructed.
- 30 August 2017 Opened to road traffic.
- 4 September 2017 Formally opened by Queen Elizabeth II.
- 2018 Became part of the M90 motorway.
What we know — and what remains uncertain
The mapped point represents an approximate centre of a long structure, not a tower or entry point. The project involved many engineers and contractors; no single individual is presented here as sole designer. No statutory designation is asserted.
Sources & further reading
- Transport Scotland: Forth Replacement Crossing – Project Details — Design development, construction, engineering and opening date.
- Forth Bridges: Queensferry Crossing — Cable-stayed structural system, length, cable overlaps and present road-only use.
- Scottish Government: Queensferry Crossing officially opens — Formal opening on 4 September 2017.
Location
Location confidence: Approximate representative bridge-centre point, not a precise pier, entrance or statutory designation coordinate. · Select the marker to open its satellite view in Google Maps. On desktop, drag Pegman (the yellow figure) onto a blue road. On mobile, turn on the Street View layer and tap a blue road. Other photo markers may be user-contributed.
Suggest a marker correction
Suggest a more accurate position
The teal marker is the current published position. The orange marker starts slightly to its right so both remain visible; this is only a visual starting position. Tap the correct place on the map or drag the orange marker. Sending this form creates a private review entry only; it does not move the published marker.
Check this area in Google Maps Choose the Satellite layer there if useful.
Map: © OpenStreetMap contributors. You can also enter checked coordinates below.